Monta
EnterprisePricing
Energy management

Load management to scale your charging network without upgrading electrical infrastructure

Monta Load Management distributes available current across your chargers in real time, adapting to building consumption as it changes. Install chargers behind shared fuses without panel upgrades, transformer replacements, or lengthy permitting delays.

Integrates with leading meter systems

Perific
ABB Modbus
MQTT
Viocon

Intelligent power distribution for any site

5 min
Rebalancing cycle
Real-time adjustments based on building consumption and charge events
3
Topology types supported
Static limits, dynamic with meters, or locally managed hardware balancing
4
External meter integrations
Perific, ABB Modbus, MQTT, and Viocon for dynamic load management
Multi-level
Group nesting
Model hierarchies from main fuse through sub-panels to individual circuits
THE PROBLEM

Electrical infrastructure limits network growth

Expanding charging networks often requires expensive electrical upgrades: new transformers, panel replacements, and months of permitting delays. Existing installations may experience breaker trips during peak hours when building and charging consumption overlap.

Without real-time visibility into available capacity, charging networks face a trade-off between overprovisioning electrical infrastructure or accepting reduced reliability during peak demand.

Automated power distribution addresses these challenges by intelligently balancing building load fluctuations while maintaining service quality at scale.

THE SOLUTION

Modular load management

Static load management for predictable sites

Best for predictable sites where building consumption is stable or minimal. You set a fixed fuse limit for a group of chargers, and Monta distributes the available current evenly or by priority.

  • Use case: Dedicated EV parking lots, overnight fleet depots, sites with separate EV-only panels
  • Configuration: Set max current per site/group, configure buffers, choose power distribution method (even split or priority-based)
  • Rebalancing trigger: Charge start/stop events
  • No external meters required
Diagram showing a single meter splitting 15A to two electric vehicles, each receiving equal charge simultaneously

Configure load management in minutes

TECHNICAL CAPABILITIES

Load management built for complex electrical topologies

  • Multi-level groups

    Model complex panel hierarchies: main fuse, sub-panels, individual circuits; matching the actual electrical topology rather than forcing a flat structure. Nest groups to any depth.

  • Scheduled power limits

    Shift available capacity by time of day. Reserve headroom during peak hours, open it up overnight. Set weekday vs. weekend schedules per site or group.

  • Compensation detection

    Detects when a charger draws more than allocated (e.g., due to firmware bugs or meter drift). Triggers immediate rebalancing to prevent fuse trips.

  • Audit-grade reporting

    API-level current logs for electrical compliance verification. Prove you never exceeded the fuse rating. Electricians and facility managers can verify via dashboard or export.

  • External meter integrations

    Perific, ABB Modbus, MQTT, Viocon. Read building consumption in real time, subtract from panel capacity, distribute remainder to chargers.

OPERATOR BENEFITS

The new operating reality

Avoid infrastructure upgrades

Install chargers without expensive panel upgrades

Eliminate manual throttling

Stop manually throttling chargers during peak hours

Prevent service disruptions

Eliminate breaker trips that damage driver trust

Maintain compliance

Prove regulatory compliance with timestamped current logs

Scale without overhead

Manage large networks without constant manual oversight

Match actual topology

Match your electrical topology, not a vendor’s flat model

white paper

Load Management: An engineers view into controlling of EV charging infrastructure

As EV adoption surges, so does the strain on local electrical infrastructure. Monta’s Load Management system ensures that even the most constrained sites, such as fleet depots, public hubs, and workplace chargers, can scale safely and intelligently, without costly grid upgrades.

Cover of the white paper Load Management at Monta

FAQs

What's the difference between Static and Dynamic Load Management?

Static Load Management uses a fixed fuse limit that you configure once. Best for sites where building consumption is predictable or minimal (e.g., dedicated EV parking lots). Dynamic Load Management uses external meters to monitor building consumption in real time, adjusting EV charging limits to stay within panel capacity. Best for multi-use sites where building load fluctuates (e.g., workplace campuses, residential buildings).

Which external meters does Monta support?

Perific, ABB ModBus, MQTT, and Viocon. Meters must provide real-time current readings per phase. Contact sales to verify compatibility with your existing meter infrastructure.

Can I use Load Management with hardware from different manufacturers?

Yes. Monta Load Management works with any OCPP 1.6 or 2.0.1 charger. You can mix hardware brands within the same site or group, and Monta will distribute load across all connectors regardless of manufacturer.

What happens if a meter fails or loses connection?

Monta detects meter communication failures and can revert to a safe fallback mode (static limits) to prevent fuse overload. You’ll receive alerts when meter connectivity is lost. Configure buffer limits to ensure safety during meter outages.

How often does Monta rebalance chargers?

Static Load Management rebalances on charge start/stop events. Dynamic Load Management (with meters) rebalances every 5 minutes when meter readings update, plus on-demand when a charge starts or stops. Locally Managed rebalancing frequency is determined by the charger firmware (e.g., Easee handles this natively).

Can I schedule different power limits for peak vs. off-peak hours?

Yes. Scheduled power limits let you define different fuse limits by time of day (e.g., reserve headroom from 8am-6pm weekdays, open full capacity overnight and weekends). Available on Business and Enterprise plans.

How do I prove compliance to electricians or facility managers?

Monta provides API-level current logs showing timestamped consumption per phase and per group. Export reports to prove you never exceeded fuse ratings. Electricians can verify compliance via the dashboard or request log exports.

Discover more features

Scale your network without rewiring

Configure load management in minutes. Install more chargers tomorrow.