Monta
EnterprisePricing
Back to full list

Rolec UltraCharge 400

The UltraCharge 400, designed and manufactured by Rolec, currently ranks on the Monta supported hardware list. The inclusion of CCS2, ChaDeMo connector(s), along with a maximum power output of 400 kW and DC charging capabilities, make the UltraCharge 400 worth considering as a viable option to meet your requirements.

DCCurrent type
400 kWMax power
Rolec UltraCharge 400

Rolec UltraCharge 400 specifications

Specifications
Full nameRolec - UltraCharge 400
ManufacturerRolec
Supported power200.0 / 240.0 / 280.0 / 320.0 / 360.0 / 400.0 kW
TypeDC
Number of connectors2
Connector type(s)CCS2, ChaDeMo

Rolec UltraCharge 400 datasheet

Monta features with Rolec UltraCharge 400 features

Get access to unique features when integrating your charger to the Monta platform.

  • Load Balancing
  • Auto Start
  • Local Auth List Management
  • Auto Charge
  • Release Detection
  • Lock Cable
  • Native Qr Serial
  • Firmware Management
  • Auto Schedules
  • Eichrecht
  • Powerbank
  • Solar Charge
  • Pricing Display
  • Display Qr Code
  • Iso 15118 2 Plug And Charge
  • Iso 15118 20 Plug And Charge
  • Pricing Display Complete

Rolec UltraCharge 400 performance and user ratings

Monta is committed to complete transparency through real-world charging and usage statistics. We evaluate all charge points in our network on a set of important criteria: charge success, user satisfaction, and uptime. The 30-day rolling averages influence a charge point models overall performance score and ranking on our supported charging stations.

Performance score

A charge point model's performance score is calculated once a day by averaging its uptime, charge success, and user satisfaction rates. The model with the highest 30-day rolling average ranks first on our supported charging stations. The lower the rolling average, the further down the list it ranks

There isn't enough usage data yet to score the Rolec UltraCharge 400 for overall performance.

Charge success rate

Once a driver starts charging their vehicle, we can track the charge success rate. This is the percentage of sessions that result in a successful energy transfer to a vehicle. In other words, it shows how reliable a specific charge point model is, which is critical for drivers, charge point operators, and manufacturers alike.

Learn the differences between a successful charge and failed charge.

There isn't enough usage data yet to score the Rolec UltraCharge 400 for charge success.

Uptime rate

Few things are more important to an EV driver than arriving at a charge point and feeling confident that it will work. And with more regulatory bodies requiring that we report hardware uptime, this is an essential measure.

Uptime rate tells drivers and manufacturers the percentage of time a charge point model is available compared to when it's out of service. When a model is available, this could mean it's reserved for charging, actually charging a vehicle, finishing a charge, or even sitting idle. When a model is unavailable, it might be because it is offline or experienced an error while delivering energy to a vehicle.

To give you the most accurate data, we look at all instances of a charge point model and have defined when we start and stop measuring uptime.

There isn't enough usage data yet to score the Rolec UltraCharge 400 for uptime.

Performance scoren/a
Charge success raten/a
Uptime raten/a

Ratings for Rolec UltraCharge 400 based on Monta's usage data

Resources

Need to integrate a Rolec UltraCharge 400 with Monta?

Want your hardware on this list?